← How Almic works

Inside the example project.

Explore the field records, source evidence and report format behind the Cedar Campus workflow.

Example projectCedar CampusProject EX-041
3 buildings · 6 samples · one connected record

Inspect the site. Capture the record.

01 / 04
Almic · Asbestos · Set 1
Site layout / EX-041 Scroll sideways to see all three buildings.
Cedar Campus: three buildings and six sampling locations Schematic, not to scale. Administration is west, Technical Services northeast and Training Hall southeast. Administration contains EX-A01 at the reception ceiling and EX-A02 in the east corridor. Technical Services contains EX-B01 in the plant room and EX-B02 in the service corridor. Training Hall contains EX-C01 at the main hall ceiling and EX-C02 in the store room. Site access A · Administration Reception Corridor EX-A01 EX-A02 B · Technical Services Plant room Service corridor EX-B01 EX-B02 C · Training Hall Main hall ceiling Store room EX-C01 EX-C02 N
  • A · Administration · EX-A01 / EX-A02
  • B · Technical Services · EX-B01 / EX-B02
  • C · Training Hall · EX-C01 / EX-C02
Schematic site layout · not to scale. Dots identify sampled locations.
View all 6 sample records

Collected sample inventory

24 Oct 2026 · PLM · TAT ND
Sample ID Building Area Material Extent Collected
EX-A01 Administration Reception ceiling White troweled ceiling finish 48 sq ft 09:10
EX-A02 Administration East corridor Brown floor tile 120 sq ft 09:30
EX-B01 Technical Services Plant room White pipe insulation 18 l ft 10:05
EX-B02 Technical Services Service corridor Grey wallboard 64 sq ft 10:25
EX-C01 Training Hall Main hall ceiling White acoustic ceiling tile 96 sq ft 11:05
EX-C02 Training Hall Store room Black floor-tile adhesive 24 sq ft 11:25

Amounts describe the represented material extent, not submitted specimen quantities.

One complete chain of custody.

02 / 04
EX-041 · Cedar Campus

Chain of custody

Project Number
EX-041
Project Description
Cedar Campus · three buildings
Inspection Date
24 Oct 2026

EX-A01–EX-C02 · Administration / Technical Services / Training Hall

Set Sample ID Description Location(s) Amount / Unit Category TAT Analysis
1 EX-A01 White troweled ceiling finish Administration · Reception ceiling 48 sq ft SM ND PLM
2 EX-A02 Brown floor tile Administration · East corridor 120 sq ft MISC ND PLM
3 EX-B01 White pipe insulation Technical Services · Plant room 18 l ft TSI ND PLM
4 EX-B02 Grey wallboard Technical Services · Service corridor 64 sq ft MISC ND PLM
5 EX-C01 White acoustic ceiling tile Training Hall · Main hall ceiling 96 sq ft MISC ND PLM
6 EX-C02 Black floor-tile adhesive Training Hall · Store room 24 sq ft MISC ND PLM
Sampled By
Inspector role · 24 Oct 2026 · 09:10–11:25
Relinquished By
Inspector role · 24 Oct 2026, 12:10
Received By
Laboratory intake role · 24 Oct 2026, 13:00

ND: next-day turnaround · PLM: polarized light microscopy. Role-based handoff entries are shown without signatures.

Check the source. Approve the results.

03 / 04
Source document · EX-LAB-041 · pages 1–2

Laboratory return

Sample ID Material Method Reported result Source
EX-A01 White troweled ceiling finish PLM Not Detected Page 1
EX-A02 Brown floor tile PLM 2% Chrysotile Page 1
EX-B01 White pipe insulation PLM 5% Chrysotile Page 1
EX-B02 Grey wallboard PLM Not Detected Page 1
EX-C01 White acoustic ceiling tile PLM Not Detected Page 2
EX-C02 Black floor-tile adhesive PLM 3% Chrysotile Page 2
Almic Send · proposed matches
6 samples matched.View proposed matches
Sample ID Field location Proposed result Evidence Match
EX-A01 Administration · Reception ceiling Not Detected Page 1 Matched
EX-A02 Administration · East corridor 2% Chrysotile Page 1 Matched
EX-B01 Technical Services · Plant room 5% Chrysotile Page 1 Matched
EX-B02 Technical Services · Service corridor Not Detected Page 1 Matched
EX-C01 Training Hall · Main hall ceiling Not Detected Page 2 Matched
EX-C02 Training Hall · Store room 3% Chrysotile Page 2 Matched
Approval pending · 6 results held

Enable JavaScript to try approval; results stay held for review.

Your report. With the evidence behind it.

04 / 04
Laboratory review required · draft report
EX-041 · Report preview · 25 Oct 2026

Asbestos building survey
Cedar Campus

Administration · Technical Services · Training Hall

Field inspection
24 Oct 2026
Sample inventory
6 specimens · EX-A01–EX-C02
Laboratory return
25 Oct 2026 · pages 1–2

Scope / Methods / Building summaries / Results / Site plan / Conclusion / Appendices

Scope

Six identified material locations were recorded across Administration, Technical Services and Training Hall at Cedar Campus. The record covers the listed sample locations and represented material extents.

Concealed materials, unsampled areas and unlisted material layers fall outside this record.

Purpose

Document the sampled materials and locations, retain the laboratory findings and provide the source records for qualified professional review.

Methods / Protocol

The inspector recorded each building, area, material description and extent, then assigned a unique sample ID. Six bulk specimens were listed on the COC for polarized light microscopy (PLM), with next-day turnaround requested.

The material extents in square feet or linear feet describe the represented material; they are not the quantity of each submitted specimen. Laboratory wording is retained beside its source-page reference.

Property Details

Cedar Campus comprises three building groups. Administration is west of the site access route; Technical Services is northeast; Training Hall is southeast. The schematic below identifies the six recorded sampling locations.

Introduction

Field collection took place on 24 October 2026. Laboratory documents returned on 25 October 2026. Almic Send presents proposed sample matches for explicit human review before laboratory information enters the reporting workflow.

Building and area summaries

A · Administration
Reception ceiling: 48 sq ft of white troweled ceiling finish (EX-A01). East corridor: 120 sq ft of brown floor tile (EX-A02).
B · Technical Services
Plant room: 18 linear ft of white pipe insulation (EX-B01). Service corridor: 64 sq ft of grey wallboard (EX-B02).
C · Training Hall
Main hall ceiling: 96 sq ft of white acoustic ceiling tile (EX-C01). Store room: 24 sq ft of black floor-tile adhesive (EX-C02).

Sampling and laboratory results

The six submitted specimen IDs match the field inventory and COC. Laboratory values are included after human review is completed.

Sample ID Building / location Material Laboratory result Source / review
EX-A01 Administration
Reception ceiling
White troweled ceiling finish Review required Held pending human approval
EX-A02 Administration
East corridor
Brown floor tile Review required Held pending human approval
EX-B01 Technical Services
Plant room
White pipe insulation Review required Held pending human approval
EX-B02 Technical Services
Service corridor
Grey wallboard Review required Held pending human approval
EX-C01 Training Hall
Main hall ceiling
White acoustic ceiling tile Review required Held pending human approval
EX-C02 Training Hall
Store room
Black floor-tile adhesive Review required Held pending human approval

Site Plan

Cedar Campus: three buildings and six sampling locations Schematic, not to scale. Administration is west, Technical Services northeast and Training Hall southeast. Administration contains EX-A01 at the reception ceiling and EX-A02 in the east corridor. Technical Services contains EX-B01 in the plant room and EX-B02 in the service corridor. Training Hall contains EX-C01 at the main hall ceiling and EX-C02 in the store room. Site access A · Administration Reception Corridor EX-A01 EX-A02 B · Technical Services Plant room Service corridor EX-B01 EX-B02 C · Training Hall Main hall ceiling Store room EX-C01 EX-C02 N
  • A · Administration · EX-A01 / EX-A02
  • B · Technical Services · EX-B01 / EX-B02
  • C · Training Hall · EX-C01 / EX-C02
Schematic site layout · not to scale. Dots identify sampled locations.

Conclusion

Laboratory results are held for review. The reviewer completes the conclusion after checking the source documents, sample matches and survey scope.

Specimen-level findings do not determine the status of unsampled areas, concealed materials or separate layers. Sampling adequacy, material condition and professional conclusions remain subject to qualified review.

Additional Discussion

EX-B02 represents the submitted wallboard specimen only; it does not establish a result for an unlisted joint-compound or skim-coat layer. Each result remains tied to its own specimen and source page.

Corrections to laboratory information retain their source references. Approving a result does not sign or issue the final report.

References

Project field record EX-041; six-sample chain of custody dated 24 October 2026; laboratory return dated 25 October 2026, pages 1–2.

Appendix 1 · Laboratory analysis report

Source return EX-LAB-041 · PLM · 25 Oct 2026. Result wording is shown only after human approval.

Sample ID Material Method Reported result Source
EX-A01 White troweled ceiling finish PLM Review required Page 1
EX-A02 Brown floor tile PLM Review required Page 1
EX-B01 White pipe insulation PLM Review required Page 1
EX-B02 Grey wallboard PLM Review required Page 1
EX-C01 White acoustic ceiling tile PLM Review required Page 2
EX-C02 Black floor-tile adhesive PLM Review required Page 2

Appendix 2 · Chain of custody

Project Number
EX-041
Project Description
Cedar Campus · three buildings
Inspection Date
24 Oct 2026
Set Sample ID Description Location(s) Amount / Unit Category TAT Analysis
1 EX-A01 White troweled ceiling finish Administration · Reception ceiling 48 sq ft SM ND PLM
2 EX-A02 Brown floor tile Administration · East corridor 120 sq ft MISC ND PLM
3 EX-B01 White pipe insulation Technical Services · Plant room 18 l ft TSI ND PLM
4 EX-B02 Grey wallboard Technical Services · Service corridor 64 sq ft MISC ND PLM
5 EX-C01 White acoustic ceiling tile Training Hall · Main hall ceiling 96 sq ft MISC ND PLM
6 EX-C02 Black floor-tile adhesive Training Hall · Store room 24 sq ft MISC ND PLM
Sampled By
Inspector role · 24 Oct 2026 · 09:10–11:25
Relinquished By
Inspector role · 24 Oct 2026, 12:10
Received By
Laboratory intake role · 24 Oct 2026, 13:00

Appendices 3–6 · Credential records

Example credential records
Record type Responsible role Record status
Laboratory credential record Laboratory reviewer role Example record · no identifier assigned
Inspector credential record Field inspector role Example record · no identifier assigned
Consultant credential record Report reviewer role Example record · no identifier assigned
Company business-license record Organization role Example record · no identifier assigned

Credential identities, validity and scope require verification in an actual reporting engagement. No signatures or credential marks are supplied here.

Cedar Campus is a fictional website illustration. This preview is not an issued report.